MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-28-2016   #11
bramagedained
 
bramagedained's Avatar
 

Join Date: May 2010
Location: KY/MN/Afghanistan
Drives: EVO IX SSL
Posts: 413
Re: My "new" car/project.

I had it started and running, so that and all the lights check out.

Things left for this leg of the project:
  1. Figure out the wipers
  2. Mount everything to the car
  3. Change out the temp/oil pressure senders for the Autometer ones.
  4. Connect the Hazard switch-I have everything run, I just ran out of solder.
  5. Connect power to the fan for heat/vent. Simple, I just need to find the plug thats in my mystery box of stuff cut from the car.
  6. Wire in neutral safety and reverse switches. This is technically part of the shifter swap.

To mount stuff, I'm waiting on borrowing a rivetnut kit/tool as that's how I'm going to do everything, instead of nuts and washers.

Last edited by bramagedained; 01-28-2016 at 08:34 PM..
bramagedained is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 05:54 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.