04-29-2012
|
#461
|
R U DTF bro?
Join Date: Aug 2003
Location: Oak Point, TX
Drives: C8 Stingray Z51
Posts: 20,620
|
Re: House Projects
55" Toshiba LED 240hz 3D TV as the main living room TV viewed from the couches, and a wall-mounted 40" Samsung LCD TV as the secondary TV behind the living room bar! I'll go snap a few pictures in a bit...
Neon beer sign coming soon.
__________________
Quote:
Originally Posted by Murlo26
I agree with Kracka.
|
Last edited by Kracka; 04-29-2012 at 04:54 PM..
|
|
|
04-29-2012
|
#462
|
R U DTF bro?
Join Date: Aug 2003
Location: Oak Point, TX
Drives: C8 Stingray Z51
Posts: 20,620
|
Re: House Projects
__________________
Quote:
Originally Posted by Murlo26
I agree with Kracka.
|
|
|
|
04-29-2012
|
#463
|
Join Date: Mar 2005
Location: Blaine, MN
Drives: '91 Automagic
Posts: 13,908
|
Re: House Projects
Very nice!
|
|
|
04-29-2012
|
#464
|
Join Date: May 2005
Location: Linwood, MN
Drives: You crazy!
Posts: 2,354
|
Re: House Projects
The TV behind the bar needs a wire tuck! Looks good though
|
|
|
04-29-2012
|
#465
|
Transmission destroyer
Join Date: Feb 2007
Location: Cambridge
Drives: G37, 91 TSi
Posts: 7,150
|
Re: House Projects
Baller son!!
__________________
Quote:
Originally Posted by scheides
I swing from the nuts of cold hard data. Anything less is a guess.
|
|
|
|
04-29-2012
|
#466
|
R U DTF bro?
Join Date: Aug 2003
Location: Oak Point, TX
Drives: C8 Stingray Z51
Posts: 20,620
|
Re: House Projects
Quote:
Originally Posted by CornFed2.4
The TV behind the bar needs a wire tuck! Looks good though
|
All in good time, I definitely plan to...I'd like to also wire in a Roku box for it, that could just be stuck to the back of the TV though.
__________________
Quote:
Originally Posted by Murlo26
I agree with Kracka.
|
|
|
|
04-29-2012
|
#467
|
Join Date: May 2005
Location: Linwood, MN
Drives: You crazy!
Posts: 2,354
|
Re: House Projects
Just saying it would suck to have a drunk kid rip it off the wall cause the cord was sticking out. Good luck!
|
|
|
04-30-2012
|
#468
|
Who has my man-card?
Join Date: Jan 2008
Location: Crystal MN
Drives: a red car
Posts: 2,162
|
Re: House Projects
looking good, glad the mount worked out for you!
|
|
|
04-30-2012
|
#469
|
R U DTF bro?
Join Date: Aug 2003
Location: Oak Point, TX
Drives: C8 Stingray Z51
Posts: 20,620
|
Re: House Projects
Quote:
Originally Posted by CornFed2.4
Just saying it would suck to have a drunk kid rip it off the wall cause the cord was sticking out. Good luck!
|
Ugh, no kidding
__________________
Quote:
Originally Posted by Murlo26
I agree with Kracka.
|
|
|
|
05-03-2012
|
#470
|
Pewp Champion
Join Date: Nov 2003
Location: Blaine
Drives: Teh Bean
Posts: 12,309
|
Re: House Projects
Update for this week. The garage floor and front porch cement have been poured. Ceilings have been painted, initial coat of paint on the walls as well. The has all the doors hung, and is 95% done with the trim. The main level has about 80% of the doors hung, and about 30% of the trim installed. I'm assuming they'll finish up the trim work tomorrow, as well as take delivery of all the cabinets
Also, I went beyond their little excavation fence and started clearing out the mess of a back yard that was completely packed with various Poplar, Willow, and Bamboo all over. Cleared it out so it's much more open now. There's still a few more we may remove but it's a huge difference already as it is.
|
|
|
05-03-2012
|
#471
|
Pewp Champion
Join Date: Nov 2003
Location: Blaine
Drives: Teh Bean
Posts: 12,309
|
Re: House Projects
yard clearing pics.
Basically what it looked like before (this area is staying wild)
After
Last edited by Halon; 05-04-2012 at 07:51 AM..
|
|
|
05-03-2012
|
#472
|
|
Re: House Projects
Looking good! Bamboo doesnt grow in mn though hahaha.
I just got done with the last coat of paint on the bathroom, cleaned up all the plastic, tarps and vaccumed, almost done! Just need to seal the tiles this weekend and install trim and towel holders. Shower door and toilet are in. My stupid phone memory stick stopped working today, so I sure hope I didnt lose all my pics ive been taking with it over the past few months.. Ill check tomorrow. Ill post pics by this weekend too.
|
|
|
05-04-2012
|
#473
|
immune from paybans
Join Date: Oct 2005
Location: West Des Moines
Drives: poorly
Posts: 4,358
|
Re: House Projects
Quote:
Originally Posted by Halon
Also, I went beyond their little excavation fence and started clearing out the mess of a back yard that was completely packed with various Poplar, Willow, and Bamboo all over.
|
Should have built an ultralight house out of bamboo!!!!
Looks like a really nice house, I'll have to visit sometime after our weddings are over.
|
|
|
05-04-2012
|
#474
|
Pewp Champion
Join Date: Nov 2003
Location: Blaine
Drives: Teh Bean
Posts: 12,309
|
Re: House Projects
It's bamboo looking stuff, I dunno the exact species I guess Lol. Yeah Andrew you'll have to come check it out sometime. We might have an extra room if you need a place to sleep while you're here
And yeah Peter I'm excited to see the pics of your new poop room!!!
|
|
|
05-13-2012
|
#475
|
Pewp Champion
Join Date: Nov 2003
Location: Blaine
Drives: Teh Bean
Posts: 12,309
|
Re: House Projects
Update for this week:
Trim is fully installed, and varnished.
All cabinets are stained, sealed, and installed.
All bathroom counter tops (cultured marble) are installed.
Final coat of paint is done in the house
Siding on the front of the house is primered and mostly installed.
They also repaired some siding on the rear we noticed was damaged.
Also, since the garage is only minimally taped (only as much as required by fire code), my cousin and I did more mudding to it, and plan to paint the garage in the next week or so. He's a professional painter so he managed to get his hands on 10gal of leftover primer, and 10gal of a light beige paint for free. So that's the color it'll be painted I guess, can't argue with free!
We also locked in a rate at Wells Fargo for a 30yr fixed mortgage at 3.625% interest, can't beat that shit.
Builder is saying they want to try and close first week of June, but something tells me that's a little aggressive. I'm guessing mid June myself.
Pics attached.
|
|
|
05-13-2012
|
#476
|
Is funding Exxon.
Join Date: Oct 2003
Location: Ham Lake
Drives: like a bat outta hell!
Posts: 7,983
|
Re: House Projects
Wow, getting close now!! I think they could have it done before the end of the month pretty easy. Mostly finishing touches and flooring now.
__________________
Is burning corn and stayin' warm!
My motorcycle is stock and reliable, my Talon is neither!
|
|
|
05-13-2012
|
#477
|
Pewp Champion
Join Date: Nov 2003
Location: Blaine
Drives: Teh Bean
Posts: 12,309
|
Re: House Projects
Flooring, lighting, install electrical outlets and switches and circuit breakers, plumbing fixtures, tile shower, appliances, kitchen counter tops, driveway, landscaping, garage doors, finish exterior siding and paint it, exterior stone, install air conditioner, install furnace, appraisal, final inspection. I dunno seems like a lot yet, but then again they never seize to surprise me.
Last edited by Halon; 05-13-2012 at 10:49 PM..
|
|
|
05-14-2012
|
#478
|
New Member
Join Date: Jul 2007
Location: Sticks
Posts: 39
|
Re: House Projects
That list right there should only take about 1.5 weeks, if they schedule properly...I think you'll be in there soon. I've worked on plenty of houses where the schedule was much tighter. It's looking great!
Last edited by 428gt; 05-14-2012 at 09:40 AM..
|
|
|
05-21-2012
|
#479
|
Pewp Champion
Join Date: Nov 2003
Location: Blaine
Drives: Teh Bean
Posts: 12,309
|
Re: House Projects
Little update for this week.
- Master bath is fully tiled (floor and shower) and grouted
- Upstairs spare bath, downstairs bath, and garage entrance/mudroom/laundry room all have vinyl flooring installed.
- Kitchen and Foyer have the Acacia hardwood laminate flooring installed
- Garage doors installed
- Stairs installed in the garage, although they installed them backwards.
- My cousin and I and a buddy sprayed primer on the walls and ceiling in the garage on Friday. Started rolling paint on the walls in there today, got about 1/4 of the way done.
- Laminate kitchen counter tops are installed.
- Laminate laundry room laundry tub counter top is installed.
- Fireplace tiled and grouted.
- Lights are all delivered to the house, assuming they will be installed this week.
- Garbage disposal delivered to the house (kinda weird but we had to supply that).
- Kitchen appliances scheduled to be delivered this Friday
|
|
|
05-22-2012
|
#480
|
Join Date: Mar 2005
Location: Blaine, MN
Drives: '91 Automagic
Posts: 13,908
|
Re: House Projects
Nice.
|
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|