Quote:
Originally Posted by LingLing
You're gonna be going on the rollers at Boost For Boobies, right?
|
No. It'll get run at MAP whenever the build is complete but I'm sure Shane will need a good two weeks once he gets the head. After assembly the motor has to be broken in, then tuned. That's why the setback was unfortunate--there's still quite a bit of work after the cams are in.
--
These builds are endless, aren't they? I need to get rubber and the Volks on, set the ride height/corner balance, alignment, new brake system installed, fix the suction line in the tank, install gauges, install splitter/canards/wing, clean up vacuum lines, do a wire tuck to show off the Primo valve cover, install Ralliart tail lights, and maybe replace the trunk plastic that I scratched the piss out of.
I might even wash the f-ing thing if I can squeeze that in. lol.