8/10/12:
Had to get some new horns they are rated to 117db.
Took off the ugly red and chrome cover things.
Drivers side mounted:
Passenger side mounted:
Pulled out the nipples on the FIAV and blocked it off internally, thanks to RRE for this info.
Internal valve turned all the way in:
Cleaned it up a little, pic doesn't show that well and I forgot to take a before pic.
All done for the night, punched back in the freeze plug and a little RTV for a piece of mind.:
8/11/12: S90 throttle body assembled and mounted.
Upper IC pipe secured, will need to be modded in the future. I actually figured out that to make life easier I should extend the outlets on the IC someday.
8/11/12: Got vacuum hoses ran, that was a most of the night job since i can't find my box of hoses and clamps. Started soldering new connectors for the 2150s. Hopefully start this damn thing tomorrow.