MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-17-2012   #11
Mark Leasure
 
Mark Leasure's Avatar
 

Join Date: Aug 2006
Location: eagan
Posts: 898
Re: Mark's 1G Winter Projects

I had a good weekend, worked on the car on Saturday for about 8 hrs. I co-located all of my gauges in the fabricated instrument cluster.


I’m going to cover up all of the old gauge location holes. I have not wired everything yet. About the wiring, I removed all of the unnecessary wiring that was just dead weight. I left all of the critical ECU functions and lighting wiring (headlights/parking, brake, turn signals, and reverse lights). I weighed everything after I was done removing it and it came up to 43 pounds!


I also picked up a 7/8” tandem master cylinder to remove the power brake booster too, I don’t know what the booster weighs, but if anything it will clear up the engine bay. I'm kicking around the idea of having the engine bay painted too, since almost everything has been removed.

__________________
Slowest: 2017 Corvette Z06 - Z07 Trim
Fast: EvoIX SE – Blouch 2.0xtr turbo – E85
Faster: Evo IX MR –PTE6266 – E85 –823WHP 9.90@147
Fastest: 92 Talon AWD – 8.14 @ 171 MPH
www.maperformance.com
Mark Leasure is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 06:01 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.