View Single Post
Old 04-24-2011   #39
Kevin 1G Drummer
 
Kevin 1G Drummer's Avatar
 

Join Date: Nov 2005
Location: Cottage Grove
Drives: Silver '02 IS300, Blue '06 Suzuki SV1000
Posts: 5,293
Re: Project Streetfighter

Thankfully nothing here locked up. I got lucky on a couple levels with this.

Anyways, here's pics of day 1 of engine teardown. about 2.5 hours worth of taking my time and making sure everything came apart right, nothing broke, and most bolts ended up back where they came from.






Front cylinder taken apart





Rear cylinder taken apart


The end of the first day


All that's left is to remove all the stator stuff, clutch stuff, the drive gears between the crank and trans, and split the case.
__________________
'02 Lexus IS300
'06 Suzuki SV1000: Back on the road and ripping hard as ever!
Kevin 1G Drummer is offline   Reply With Quote