Log in

View Full Version : project darkness


Pages : 1 2 3 4 5 [6] 7 8

93gtpeater
10-28-2013, 08:29 PM
I hope to god I don't need to do any more transmission work. This thing should be bullet proof for what kind of power I am making. But I will keep him in mind. I will hopefully be building another turbo Ls for my vette

93gtpeater
03-27-2014, 11:41 AM
Little update. Having a driveshaft built right now. So hopefully by next week the truck will be on the road. Just need the driveshaft and a new trans dipstick assembly. Iam going to daily drive it and fix a bunch of things this year if everything works smoothly.

b00sted_spyder
03-27-2014, 03:06 PM
Where are you having the driveshaft built?

Halon
03-27-2014, 03:44 PM
Awesome man, can't wait to see this beast on the road.

93gtpeater
03-27-2014, 03:46 PM
Universal Driveline inc. The place is on hwy 61 in whitebear lake.

b00sted_spyder
03-27-2014, 04:57 PM
What size joints are you putting in there? How much is the whole shaft?

93gtpeater
03-27-2014, 05:47 PM
Iam using standard u joints and he said about 400 bucks. He said I could go bigger but its pointless if I dont change the yoke on the rear end.

turbotalon1g
03-27-2014, 07:10 PM
Much excite to see this thing rolling for once! (my fault not yours)

C3L1CA
03-27-2014, 10:16 PM
Git-r-done!

I are still want a ride in this sum bitch once you get it all together!

93gtpeater
04-02-2014, 01:00 PM
Got transmission dipstick today. Hopefully I can pick up my new driveshaft this friday. If everything goes as plan I can start driving it this weekend