Re: House Projects

Last year I had a 40x60 pole building built to have a place to work on all my projects. I had the floor poured and then I installed the electrical panel and meter socket as well last year. Xcel energy hooked up the power in late fall and then it sat over the winter.





This year I've begun coating the floor with epoxy. I decided to go with white coated with clear to brighten it up and make it easy to find small parts that get dropped.

To make the coating as even as possible, I'm coating each 10x10 area that is separated by relief cuts separately. Once the white is all applied and cured the whole floor will be gone over with an abrasive pad to prep it for the clear coat.



Once the floor is finished I'll begin sealing all the leaks up in the walls and roof. I watched where the building let in snow in the winter and rain in the spring so I'll deal with those and then begin electrical and finishing and insulating the interior. My hope is to get it completed this year.
Attached Thumbnails
Click image for larger version

Name:	side.JPG
Views:	462
Size:	80.8 KB
ID:	15135   Click image for larger version

Name:	front.JPG
Views:	462
Size:	77.2 KB
ID:	15136   Click image for larger version

Name:	floor.JPG
Views:	453
Size:	60.6 KB
ID:	15137  

__________________
Nothing is exactly as it seems, nor is it otherwise.

Last edited by jeremy1375; 04-10-2015 at 01:19 PM..
jeremy1375 is offline   Reply With Quote