Got the WG springs installed. I bought the wrong combo so I could only get 2 in there. So I have the 10psi and the 5psi in there. So 15psi base for now. I'll get a different 3rd one eventually because I want a higher base spring pressure than that.
Got the shifter linkage cut down, and big thanks to Momin for welding it up for me! I got that back installed, along with that new shifter base bracket. Got my preliminary hole cut in the tunnel. Shifter looks like it will be near where the ash tray is. would like to modify the shifter if possible. Also installed the new clutch slave cylinder.
Got more of the motor put together. I have a lot of things just finger tight for now for fitting everything together. But pretty good progress. Hopefully get a little more done tomorrow and then I head outta town for a couple weeks so she will just sit.