Re: House Projects

Simply put, the people he's sourced to do the work just haven't cut it. I've saved roughly 4 grand by doing some shit ourselves and going with a guy who has been lower than everyone else we talked to. But now we have a painted cement floor in the basement that's stained with drywall, outside deck stained with drywall, insulation on the backside of walls that's just hanging loose cause it's not cut to size, stairs that got torn up and had to be sanded down on the edges to avoid splinters and such (looks retarded) and left over cry wallk scrap (little pieces) in the back yard from him tossing the scrap out the window for easier removal.

Not once was plastic used to cover anything during ther mudding and sanding process so we had a TON of cleaning to do even after they attempted to clean it up. It just hasn't been a great experiance and now we are just doing the minimums to make the room in the basement finished for living and use. We'll revist a remodel in the next year or two for the rest of the basement.

The 3 or 4 car garage and privacy fence is priority to get planned, designed, and hopefully up by spring if all goes well.