View Single Post
Old 12-29-2017   #920
Mark Leasure
 
Mark Leasure's Avatar
 

Join Date: Aug 2006
Location: eagan
Posts: 898
Re: Mark's 1G Winter Projects

The cage is done! I'll be getting it certified next month. It's been an awesome project. The seat mount and belts are done too.





I also removed a little more than 10 more pounds of metal from the front driveshaft carrier bearing mount and supporting structure from driveshaft tunnel. This sucked to remove, i was drilling spotwelds for 3 to 4 hours! It was well worth that time for that much of a weight reduction. I'll need to get this thing on corner scales to see what it comes out at.



To remove the driveshaft support structure I had to cut out emergency brake cable bulkhead from the floor. I got to use my bead roller and made a patch panel, and plug weld at all the areas where I accidentally drilled through while removing the spot welds. I also stitch welded back in the floor section I cut for the tube that intersects it.

__________________
Slowest: 2017 Corvette Z06 - Z07 Trim
Fast: EvoIX SE – Blouch 2.0xtr turbo – E85
Faster: Evo IX MR –PTE6266 – E85 –823WHP 9.90@147
Fastest: 92 Talon AWD – 8.14 @ 171 MPH
www.maperformance.com

Last edited by Mark Leasure; 12-29-2017 at 04:47 PM..
Mark Leasure is offline   Reply With Quote