|
Re: MitsuStyle Spring 2012 cruise - April 21-22, 2012 - Ashland, WI
Got a decent amount done in the last couple of days:
- Finished replacing 100% of the bushings in the rear subframe, including mustache bushings
- Added active toe eliminator from s1ngletracker (perfect fit, btw)
- Added a RM rear sway bar
- Added poly bushings to the front sway bar (this was a bitch)
- Installed Ingalls adjustable upper control arms
- Installed new clutch (went with 6 puck unsprung over 4 puck this time)
- Replaced the power steering rack with Kevin/Mondale's low mile unit -added new end links
- Re-installed engine and transmission
- Fabbed new intercooler pipes for short route to clear my whale penis intake pipe
- Fixed my propeller shaft (it met a train track in Minneapolis last fall)
All that's left is to add fluids and toss the suspension back on and I am read to rock the casbah.
I'd like to note, I am bit apprehensive driving this new setup as I am used to employing fairly strong amounts of trail braking to initiate rotation on corner entry. I suspect I am going to over rotate a few times getting use to the new setup 
__________________
"The moment money becomes your motivation, you're immediately not as good as someone who is stimulated by passion and internal will"
-Sebastian Vettel
|