Last weekend a painter friend came over and we sprayed the ceiling and walls with primer and a base coat of white. Then yesterday we got to puttign some colour on the walls. We still have to decide what colour to do the bathroom and what colour to do the other bedroom. Once those are painted I'll be doing my tile by the walk-out door (I laid it out already in the pics) and the bathroom. I'll also put the wood floor in the office. Then we'll put in all of the doors and get the trim in. Then it's carpet and we're pretty much done expect for the bathrooms. But, we're in no rush for the bathroom since we already have two upstairs.
Main room:
Entry to basement and office:
Office:
Hallway:
Structured wiring box and home theater stuff. I'll be putting in a wall mount shelf for my components and I have an IR distribution system and wall outlets for HDMI and TOSlink (for multi channel audio for over the air broadcasts because we don't have cable/satellite) as well as for the 7.1 surround speakers: