Today got the holes for the head studs drilled out (2g head).
Head is installed and torqued to 90ft/lbs for now. TB is on. IC piping and Intake are on. Turbo and oil feed line are one. Fuel rail and injectors are on (had to adjust where I originally mounted my fuel filter). T-Case and driveshaft on. Most of the vacuum hosing is connected, but I'm thinking about redoing all my vacuum hose completely as it's kinda messy.
Tomorrow I hope to get the cam's and timing belt on. Finish the Oil Drain line. Install axle. Install Exhaust. Then start figuring out what I forgot
