Finally got a bit more done
Piping is done, aside from the open dump. We cut it, welded on a flange for the 38mm, and are waiting on the 1 3/4 pipe to come in (sigh backordered stuff). As soon as that comes, it will get welded on and everything will be going off to be powdercoated!
Got the FPR all hooked up and new lines on the fuel pump. Also waiting for my Fuel Lab inline fuel pump to come in the mail...
