|
Re: Head work
This recent work took about a week and a half. But that was due to them having to replace 10 bent valves, and apparently a lot of my valve guides weren't straight from the last place that did it so they're redoing that, and the bottom of the head wasn't resurfaced as smooth as it should have been by that place either so they're doing that.
But if you're just looking to get the thing tested, I can usually bring it in around lunch, and have it back by dinner. And I am the king of bent valves, so I bring them stuff a lot, and I'm always happy with their service.
|