MitsuStyle

MitsuStyle (http://www.mitsustyle.com/forums/index.php)
-   Project Talk (http://www.mitsustyle.com/forums/forumdisplay.php?f=5)
-   -   Mark's 1G Winter Projects (http://www.mitsustyle.com/forums/showthread.php?t=29183)

enasnitsi 12-26-2014 05:53 PM

Re: Mark's 1G Winter Projects
 
1 Attachment(s)
I'd like to see what you do with yours.

Here is a picture of their k-member.

Mark Leasure 12-26-2014 06:59 PM

Re: Mark's 1G Winter Projects
 
Quote:

Originally Posted by enasnitsi (Post 451601)
I'd like to see what you do with yours.

Here is a picture of their k-member.

Check this out, it's a good design. It has good triangulation with the best weight savings. I'm building this one:

http://www.dsmtuners.com/threads/93-....456345/page-7

enasnitsi 12-26-2014 08:13 PM

Re: Mark's 1G Winter Projects
 
Yeah that one looks good. I'll have to save that one for making my own. Looks like the hardest part is the ball joint receivers. I'm assuming heim joints will be used to connect lca's to k-member.

Mark Leasure 01-11-2015 09:42 AM

Re: Mark's 1G Winter Projects
 
Quick update. If have been making parts for the kmember project. I made the tube tabs or chassis brackets, whatever they call them. They are made from 4130 and took forever to machine. I have all the materials so now I just need to get fabricating.

http://i412.photobucket.com/albums/p...0_143309_3.jpg

And on the engine project I decided to upgrade my headstuds using the boostin performance 1/2" kit. You need to machine and install 1/2" timeserts in the block to accept the new stud. The machining is not the easiest, and if there are any mistakes the block is junk. So I measured everything to insure my mill and block were dial indicated in. Then I started by finding the hole centers individually with a dial indicator.

http://i412.photobucket.com/albums/p...110_121537.jpg

Then it was time to drill the block to a depth of 1.45"

http://i412.photobucket.com/albums/p...110_122438.jpg

Then you need to sink the timesert under the deck, like how the original studs are setup. I cut to a depth of 0.175" with a 5/8" endmill cutter.

http://i412.photobucket.com/albums/p...110_123127.jpg

Now it's time to tap the threads, using the mill.

http://i412.photobucket.com/albums/p...110_123400.jpg

http://i412.photobucket.com/albums/p...110_123834.jpg

Install the insert with the installation tool in the timesert kit and move on. In the first picture there is one installed directly in front of the hole that was being indicated.

http://i412.photobucket.com/albums/p...110_124211.jpg

The cylinder head needs machining next, to clearance or ream the holes and to add a machined in load washer. My custom pistons are going to arrive at the end of the month.

turbotalon1g 01-11-2015 10:55 AM

Re: Mark's 1G Winter Projects
 
This is mind blowing

TkrPerformance 01-11-2015 12:15 PM

Re: Mark's 1G Winter Projects
 
crazy

scheides 01-11-2015 01:01 PM

Re: Mark's 1G Winter Projects
 
Bad ass!!!

dogwhistle 01-11-2015 01:39 PM

Re: Mark's 1G Winter Projects
 
That's remarkable!

evotuner 01-11-2015 03:02 PM

Re: Mark's 1G Winter Projects
 
You sir are a wizard

enasnitsi 01-11-2015 05:46 PM

Re: Mark's 1G Winter Projects
 
Nice work!

For those chassis tabs is it needed they go around the tube? Could they just have a radius and be welded on.

What kind of machining equipment do you have?

Mark Leasure 01-11-2015 09:10 PM

Re: Mark's 1G Winter Projects
 
Thanks for the feedback!

Quote:

Originally Posted by enasnitsi (Post 451944)
Nice work!

For those chassis tabs is it needed they go around the tube? Could they just have a radius and be welded on.

What kind of machining equipment do you have?

The reason they are round is that I can mock the suspension up without needing to weld any thing up.

I've got a bridgeport mill, a 14" gunsmith lathe, dake johnson vertical 16" bandsaw, a decent size horizontal band saw, and a lot of other supporting equipment.

jeremy1375 01-11-2015 10:54 PM

Re: Mark's 1G Winter Projects
 
Awesome! I'm looking forward to seeing how the stud kit holds up for you. I've had my eye on that kit since it was released. I was slightly disappointed that the 6 bolt requires Time-Serts while the studs directly fit the 7 bolt after rethreading the hole. I'm sure it'll work great. I've seen Time-Serts fail in aluminum blocks and that's created a bit of unfounded bias since the 4g63 is cast iron lol.

dsmDolney 01-12-2015 05:48 PM

Re: Mark's 1G Winter Projects
 
Awsome !! Thats so cool you did all of it urself. Very impressive !!

Mark Leasure 01-18-2015 10:46 AM

Re: Mark's 1G Winter Projects
 
On to the next step. I filled the block yesterday. I ended up going about 1 inch down from the deck surface, I think that's considered a three-quarter fill. It was my first time messing around with block filler. It's not the easiest stuff to work with, since the water holes in the deck only allow you to use a small funnel when filling. And the stuff is messy. Thanks goes out to John for letting me use one of his torque plates. Applying 110 lb/ft to the head studs is weird, it's like tightening lug nuts. The rubber hose allows insurance that there is a water path from the pump. They are easily removed when the block filler is cured. I removed the water pump block off plate after 10 hours and removed some semi cured filler material to insure proper water pump functionality. The next step is to get the block out for line honing the mains.

http://i412.photobucket.com/albums/p...117_132418.jpg

http://i412.photobucket.com/albums/p...118_020705.jpg

Dark2g 01-18-2015 12:44 PM

Re: Mark's 1G Winter Projects
 
This motor is gonna be awesome mark. You really do clean work on all of your projects. Such an inspiration!

Pushit2.0 01-20-2015 12:18 AM

Re: Mark's 1G Winter Projects
 
Looks perfect

turbotalon1g 01-20-2015 09:15 AM

Re: Mark's 1G Winter Projects
 
Love it

Mark Leasure 01-24-2015 10:26 AM

Re: Mark's 1G Winter Projects
 
Now that the block is at maperformance for machining I'm starting my kmember fab. First stop is measuring everything and get a starting weight.

72 lbs, it has all the bolts, brackets, and driveshaft loop. I know others have weighed just arms and kmember at 64. This is going to save a ton of weight!

http://i412.photobucket.com/albums/p...124_091456.jpg

turbotalon1g 01-24-2015 10:48 AM

Re: Mark's 1G Winter Projects
 
Nice, man this is so awesome.
Do you want to practice on my car?
When is the assembly party?

turbotalon1g 01-27-2015 07:14 PM

Re: Mark's 1G Winter Projects
 
Are you running a stub shaft or turned down "race shaft" for the balance shaft?


All times are GMT -5. The time now is 12:04 AM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.